카테고리 메뉴

VES 로고

KOR

RESULT

Total clean product development

RESULT

Result (Air shower, etc.)
Result (Air shower, etc.)
Project name Customer
Site Participated discipline Period
Air shower manufacturing and supply for Samsung Samsung Electronics Mexico Zoom Tech
Mexico 7 air shower 23.10~present
Clean bench supply to MTM hitech Hwaseong MTM hitech
Korea clean bench 1EA 23.09~23.10
Air shower manufacturing and supply for Cartech U.S.A. Cartech
U.S.A. air shower 23.08~present
Air shower manufacturing and supply for Samsung Elec Busan Samsung Electronics
Korea 1 air shower 23.07~23.09
Air shower manufacturing and supply for Mediclus Cheongju Mediclus
Korea 1 air shower 23.07~23.09
Pass box manufacturing and installation for Yuhanchem Ansan Yuhanchem
Korea 1 pass box 23.05~23.05
Air shower manufacturing and supply for Samsung Electronics Mexico Samsung Electronics
Mexico 1 air shower 23.04~23.04
Pass box manufacturing and installation for Basetech Gunsan Basetech
Korea 1 pass box 23.01~23.03
Air shower manufacturing and supply for Fides Seoul Fides
Korea 1 air shower 22.12~23.05
Pass box manufacturing and installation for Samsung Electronics Mexico Samsung Electronics
Mexico 1 pass box 22.12~23.01
UP Down Pass box manufacturing and installation for SamsungEM Busan SamsungEM
Korea 3 up down pass box 22.11~23.01
Air shower manufacturing and supply for SFA SEMICON Philippines Jeonseoung
Philippines 1 air shower 22.10~22.11
Air shower manufacturing and supply for Design mitt Jinju Design mitt
Korea 1 air shower 22.10~22.11
Pass box manufacturing and installation for Samsung SDI Suwon Samsung SDI
Korea 1 pass box 22.08~22.09
Air shower manufacturing and supply for SamsungEM Suwon SamsungEM
Korea 1 air shower 22.07~22.08
Air shower manufacturing and supply for HobanSummit Dangjin Dasanpng
Korea 2 air shower 22.07~22.12
Air shower manufacturing and supply for Samsung Electronics Slovakia Samsung Electronics
Slovakia 1 air shower 22.07~22.08
Air shower manufacturing and supply for HYindustry Anyang HYindustry
Korea 1 air shower 22.06~22.07
Air shower manufacturing and supply for Samsung Electronics Suwon Samsung Electronics
Korea 1 air shower 22.06~22.06
Air shower and Auto door manufacturing and supply for Samsung Electronics Egypt Samsung Electronics
Egypt 1 air shower, 2 auto door 22.04~22.06
Air shower and Pass box manufacturing and supply for Samsung Electronics Suwon Samsung Electronics
Korea 1 air shower, 1 pass box 22.04~22.06
Air shower manufacturing and supply for Dalma Elec Gwangju Dalma Elec
Korea 1 air shower 22.03~22.05
Pass box manufacturing and installation for IGS Icheon IGS
Korea 1 pass box 22.03~22.06
Air shower manufacturing and supply for Poscoenc Apartment Kim&Lee
Korea 24 air shower 22.03~22.06
Air shower manufacturing and supply for Samsung Elec Mexico Zoom Tech
Mexico 2 air shower 22.03~22.06
Air shower manufacturing and supply for SamsungEM Busan SamsungEM
Korea 1 air shower 22.01~22.04
Air shower manufacturing and supply for Gwangshin Progress Apartment Gwangshin
Korea 39 air shower 22.02~23.06
Air shower manufacturing and supply for SamsungEM Busan SamsungEM
Korea 1 air shower 22.01~22.04
Pass box manufacturing and installation for SamsungEM Busan SamsungEM
Korea 1 up down pass box 22.01~22.03
Air shower manufacturing and supply for Poscoenc Daegu Samhwa
Korea 7 apartment air shower 22.01~22.04
Air shower manufacturing and supply for KAIST KAIST
Korea 1 air shower 22.01~22.01
Pass box manufacturing and installation for MDS Incheon MDS
Korea 1 pass box 21.12~21.12
Repair Air shower for Seoul National University Seoul University
Korea Air shower repair 21.12~21.12
Air shower manufacturing and supply for Posocoenc, Apartment JUNGDO
Korea 4 air shower 21.12~22.02
Repair Air shower for SamsungEM Busan SamsungEM
Korea Air shower repair 21.12~21.12
Air shower manufacturing and supply for Postnatal care center Dasanpng
Korea 1 air shower 21.11~21.11
Air shower manufacturing and supply for SamsungEM Suwon SamsungEM
Korea 1 air shower 21.11~21.12
Air shower manufacturing and supply for IGS Hwaeeong IGS
Korea 1 air shower 21.10~21.11
Air shower manufacturing and supply for Jongno-gu Office Dasanpng
Korea 1 air shower 21.10~21.10
Relocating Air shower and Pass box manufacturing and supply for Kaceco Ansan Kaceco
Korea relocating air shower, 1 pass box 21.10~21.11
Air shower manufacturing and supply for Samsung Electronics Mexico Zoom Tech
Mexico 4 air shower 21.09~21.11
Air shower manufacturing and supply for Samsung Electronics Egypt Samsung Electronics
Egypt 1 air shower 21.08~22.01
Relocating Air shower and Pass box manufacturing and supply for KCENC Pyeongtaek KCENC
Korea relocating air shower, 1 pass box 21.07~21.09
Pass box manufacturing and installation for TotalENG Ulsan TotalENG
Korea 4 pass box 21.07~21.11
Air shower manufacturing and supply for Samsung Electronics Suwon Samsung Electronics
Korea 1 air shower 21.06~21.06
Air shower manufacturing and supply for Gwangju Institute Dasanpng
Korea 2 air shower 21.05~21.06
Air shower manufacturing and supply for Gwangjin library Dasanpng
Korea 1 air shower 21.05~21.06
Air shower manufacturing and supply for Jayang library Dasanpng
Korea 1 air shower 21.05~21.06
Pass box manufacturing and installation for SamsungEM Wuhyun
Korea 1 pass box 21.05~21.06
Pass box manufacturing and installation for Planm Eumseong Planm
Korea 20 pass box 21.04~21.12
Air shower manufacturing and supply for Dasanpng Iksan Dasanpng
Korea 2 air shower 21.03~21.04
Air shower manufacturing and supply for YnSelec Anyang Ynselec
Korea 1 air shower 21.02~21.02
Air shower manufacturing and supply for Design Bean Gunpo Design Bean
Korea 2 air shower 21.02~21.02
Air shower manufacturing and supply for LGInonotek Gumi Sinwon ENC
Korea 1 air shower 21.01~21.02
Air shower manufacturing and supply for Naon Gunpo Naon
Korea 1 air shower 21.01~21.02
Pass box manufacturing and installation for MDS Gangnamm MDS
Korea 2 pass box 21.01~21.02
Pass box manufacturing and installation for Planm Eumseong Planm
Korea 2 pass box 21.01~21.02
Air shower manufacturing and supply for Gwangin-gu office Dasanpng
Korea 1 air shower 21.01~21.02
Pass box manufacturing and installation for BAenergy Hampyeong BAenergy
Korea 1 pass box 20.12~20.12
Air shower and Pass box manufacturing and supply for Kaceco Hwaeseong Kaceco
Korea 1 air shower, 1 pass box 20.10~20.11
Air shower manufacturing and supply for IGS Hwaeseong IGS
Korea 1 air shower 20.10~20.11
Air shower manufacturing and supply for Dasanpng Jangheung Dasanpng
Korea 1 air shower 20.10~20.11
Air shower manufacturing and supply for Hydrogen Reamer Plant Uiwang Hyundai Rotem
Korea 1 air shower 20.09~20.10
Air shower manufacturing and supply for ShingYoungDO Tower Seoul Dasanpng
Korea 1 air shower 20.09~20.09
Air shower manufacturing and supply for Samsung SDC Seoul JNT Eng
Korea 2 air shower 20.09~20.10
Air shower manufacturing and supply for Youngkong Hwaseong Youngkong
Korea 1 air shower 20.09~20.09
Air shower manufacturing and supply for SRT Hwaseong G-three
Korea 5 air shower 20.08~20.10
Air shower manufacturing and supply for Changnyoung mask factory Changnyoung
Korea 1 air shower 20.08~20.09
Air shower manufacturing and pass box relocaging work supply for SamsungEM Busan Wuhyun
Korea 7 air shower, 3 pass box relocating work 20.04~20.07
Air shower manufacturing and supply for Dasanpng Seoul Dasanpng
Korea 5 air shower 20.02~20.06
Air shower manufacturing and supply for Tobang E&C Gwangju Tobang
Korea 2 air shower 20.01~20.02
Air shower manufacturing and supply for SG Suncheon SG
Korea 1 air shower 20.01~20.02
Air shower and Pass box manufacturing and supply for Getech Vietnam Getech
Vietnam 15 air shower, 6 pass box 19.11~20.01
Air Shower Relocating work for SamsungEM Busan SamsungEM
Korea Air Shower Relocating work 19.11~19.11
Air shower manufacturing and supply for Samsung Electronics Egypt Samsung Electronics
Egypt Tunnel type Air Shower Relocating & Extension work 19.11~20.12
Exhaust workstation manufacturing and supply for Samsungmedison Gumi Samsungmedison
Korea 12 exhaust workstation 19.09~19.12
Air shower manufacturing and supply for Posco The Sharp Model home Shinhwa
Korea 2 air shower 19.06~19.07
Air shower manufacturing and supply for Hillstate Model home Dongil Interior
Korea 1 air shower 19.06~19.06
Air shower manufacturing and supply for Secuve Jincheon Secuve
Korea 1 air shower 19.05~19.05
Air shower manufacturing and supply for Posco The Sharp Model home Dawonid
Korea 1 air shower 19.04~19.04
Air shower manufacturing and supply for Hankook Umicore Hankook Umicore
Korea 1 air shower 19.04~19.05
Air shower manufacturing and supply for Umicore Cheonan Umicore
Korea 8 air shower 19.04~19.05
Pass box manufacturing and installation for Samsung Electro-mechanics, Busan Samsung Electro-mechanics
Korea 2 pass box 19.03~19.03
Air shower manufacturing and supply for Sfarm Chungju Sfarm
Korea 1 air shower 19.03~19.04
Air shower manufacturing and supply for Hyundai-steel Dangjin factory Dawon Engineering
Korea 1 air shower 19.03~19.04
Air shower manufacturing and supply for Samsung Electronics VD Division Samsung Electronics
Korea 2 air shower 19.01~19.03
Pass box manufacturing and installation for Etech Philippines Etech
Philippines 2 pass box 18.12~19.01
Air shower manufacturing and supply for Samditech Vietnam Samditech
Vietnam 1 air shower 18.12~19.01
Air shower manufacturing and supply for Cotem Paju Sungdo ENG
Korea 2 air shower 18.09~19.01
Air shower manufacturing and supply for Jinsung IND Jinsung IND
Vietnam 25 air shower 18.09~19.01
Air shower manufacturing and supply for DB-Hitek D-Engineering
Korea 1 air shower 18.09~18.09
Air shower manufacturing and supply for SEV Network Third Samsung Electronics
Vietnam 1 air shower 18.06~18.08
Air shower manufacturing and supply for Posco The Sharp Model home MDM PLUS
Korea 1 air shower 18.06~18.06
Air shower manufacturing and supply for Hillstate Model home Bescon International
Korea 1 air shower 18.06~18.07
Air shower manufacturing and supply for Hillstate Model home Forte line
Korea 1 air shower 18.05~18.06
Air shower manufacturing and supply for KCENC Gas Production Division KCENC
Korea 1 air shower 18.05~18.07
Air shower manufacturing and supply for Cksolution Cksolution
Korea 1 air shower 18.05~18.05
Air shower and Pass box manufacturing and supply for DB-Hitek Mobi Engineering
Korea 1 air shower, 1 pass box 18.04~18.05
Air shower and Pass box manufacturing and supply for SIEMENS Helthineers Narae ENC
Korea 2 air shower, 1 pass box 18.03~18.05
Air shower manufacturing and supply for Hillstate Model home Fides Development
Korea 1 air shower 18.03~18.03
Air shower manufacturing and supply for Samsung SDI Gumi Samsung SDI
Korea 1 air shower 18.02~18.05
Air shower manufacturing and supply for INNOX INNOX
Korea 2 air shower 18.02~18.05
Clean bench supply for SEVT Samsung Electronics
Vietnam 20 clean bench 18.01~18.02
Air shower and Pass box manufacturing and supply for GBPLEN Philippines Narae ENC
Philippines 1 air shower, 1 pass box 18.01~18.02
Clean bench supply for Ahsan ENG Ochang Ahsan ENG
Korea 2 clean bench 18.01~18.02
Air shower manufacturing and supply for SEVT Samsung Electronics
Vietnam 1 air shower 18.01~18.04
Air shower manufacturing and supply for Yujinrobot Yujinrobot
Korea 1 air shower 18.01~18.02
Air shower manufacturing and supply for Seoul Semiconductor Vietnam Hanyang ENG
Vietnam 12 air shower 17.12~18.03
Clean bench supply to Samsung Medison Gumi factory Samsung Medison
Korea 13 clean bench 17.11~17.12
Clean bench supply for SEVT Samsung Electronics
Vietnam 14 clean bench 17.11~17.11
Air shower manufacturing and supply for GS Chem Jincheon Tracon
Korea 8 air shower door 17.10~17.11
Air shower manufacturing and supply for Samsung Electronics Egypt Samsung Electronics
Egypt 1 tunnel air shower 17.09~17.10
Lift Pass box manufacturing and installation for SEVT Travis Elevator
Vietnam 1 lift pass box 17.07~17.09
Air shower manufacturing and supply for Samsung SDI Cheonan factory Samsung SDI
Korea 2 air shower 17.04~17.07
Samsung C&T SEV Retrofit Air shower manufacturing and supply Samsung C&T
Vietnam 1 air shower 17.03~17.07
Hand shower supply to Samsung Display Vietnam IMV
Vietnam 24 hand shower 17.03~17.07
Air shower manufacturing and supply for IM Vietnam GE Tech
Vietnam 6 air shower, 3 pass box 17.03~17.07
Air shower manufacturing and supply for Samsung Electronics Hungary Samsung Electronics
Hungary 2 air shower 17.02~17.07
Hand shower supply to Samsung Display Vietnam IMV
Vietnam 33 hand shower 17.02~17.07
Clean bench supply to Samsung Medison Gumi factory Samsung Medison
Korea 7 clean bench 17.02~17.03
Air shower manufacturing and supply for SRENG Seoul Semiconductor Vietnam SRENG
Vietnam 4 air shower 17.01~17.03
Air shower and pass box manufacturing and Relief Damper and installation for Posco ENC Posco ENC
Korea 4 air shower, 1 pass box, 9 relief demper 16.07~16.11
Air shower and pass box manufacturing and installation for Soulbrain Paju Soulbrain
Korea 4 air shower 16.06~16.12
Air shower manufacturing and supply for Aron Namuga Vietnam Aron
Vietnam 2 air shower 16.05~16.06
Air shower manufacturing and supply for Samsung Electro-mechanics Suwon Samsung Electro-mechanics
Korea 2 air shower 16.04~16.05
Air shower manufacturing and supply for Enjet Suwon Enjet
Korea 1 air shower 16.03~17.06
Air shower manufacturing and supply for Samsung C&T SEMPHIL P4 Samsung C&T
Philippines 29 air shower 16.03~17.06
Pass box manufacturing and installation for SEVT Samsung Electronics
Vietnam 2 conveyor type pass box 16.03~16.04
Air shower and pass box manufacturing and installation for IM Philippines IM
Philippines 3 air shower, 1 pass box 16.02~16.05
Pass box manufacturing and installation for Samsung Electro-mechanics Busan Samsung Electro-mechanics
Korea 1 pass box 16.02~16.03
Air shower manufacturing and supply for Aron Namuga Vietnam Aron
Vietnam 3 air shower 16.01~16.02
Air shower manufacturing and supply for SEVT Samsung Electronics
Vietnam 3 air shower 16.01~16.02
Air shower manufacturing and supply for IM Philippines IM
Philippines 6 air shower, 2 pass box 15.12~16.01
Air shower manufacturing and supply for Samsung Electro-mechanics Samsung Electro-mechanics
Korea 1 air shower 15.12~16.01
Air shower manufacturing and supply for IZU Noblelink Philippines IZU Noblelink
Philippines 3 air shower, 1 pass box 15.11~15.12
Air shower manufacturing and supply for QSTEC Qatar QSTEC
Qatar 4 air shower, 2 pass box 15.09~17.04
Air shower manufacturing and supply for SEHC Samsung Electronics
Vietnam 2 air shower 15.09~16.04
Air shower manufacturing and supply for Wisol Osan Wisol
Korea 4 air shower, 2 pass box 15.09~15.10
Air shower manufacturing and supply for Samsung SDI Gumi Samsung SDI
Korea 4 air shower 15.08~15.10
Hand shower supply to Samsung Display Vietnam Samsung Electro-mechanics
Korea 2 air shower, 1 pass box 15.08~15.10
Hand shower supply to Samsung Display Vietnam IMV
Vietnam 12 hand shower 15.08~15.10
Air shower manufacturing and supply for Soulbrain Gongju Soulbrain
Korea 4 air shower 15.08~15.10
Air shower manufacturing and supply for Toray Battery Gumi Toray Battery Separator Film
Korea 8 air shower, 3 pass box 15.07~15.10
Air shower manufacturing and supply for GBPLEN Philippines GBPLEN
Philippines 7 air shower, 2 pass box 15.07~15.10
Air shower manufacturing and supply for Aron Namuga Vietnam Aron
Vietnam 5 air shower, 2 pass box 15.06~15.08
Air shower manufacturing and supply for Samsung Electronics Vietnam Samsung C&T
Vietnam 9 air shower, 18 hand shower 15.05~15.06
BLDC FFU supply to Samsung Electronics Vietnam IMK
Vietnam BLDC FFU, FILTER(32EA) 17.10~17.10


Result (FFU & FILTER, etc.)
Result (FFU & FILTER, etc.)
Project name Customer
Site Participated discipline Period
No data.


Result (Mini Environment)
Result (Mini Environment)
Project name Customer
Site Participated discipline Period
Manufacturing and installation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea M2 1st floor Slitter overfinsishing and LM guide door 23.11~present
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(1 factory 2,3 line Clean Booth 7EA) 23.11~present
Manufacturing and installation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Laser etching equipment booth 23.11~present
Manufacturing and installation of clean booth for Samsung SDI Ceonan Samsung SDI
Korea Press, Slitter Clean Booth 23.10~present
Manufacturing and installation of clean booth for Samsung SDI Suwon Samsung SDI
Korea P4 Mixer Localized Dehumidification Booth 23.09~present
Manufacturing and installation of clean booth for Cartech U.S.A. Cartech
U.S.A. Clean Booth 23.08~present
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(1 factory 1~3 line powder process dust collectors) 23.08~present
Upgrade of clean booth for Samsung SDI Ceonan Samsung SDI
Korea Clean Booth Upgrade(M1 1st floor) 23.08~23.08
Upgrade of clean booth for Samsung SDI Ceonan Samsung SDI
Korea Clean Booth Upgrade(M2 1st floor) 23.07~23.08
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary 1 factory, 1~3line B-coater debris drop fence installation 23.07~present
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(Rewinder) 23.06~present
Remove and relocation of clean booth for Samsung SDI Suwon Samsung SDI
Korea Clean Booth Demolition and Reinstallation 23.05~23.05
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(1 factory 3-1 Press) 23.04~present
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(2 factory), FFU, FILTER 23.01~present
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(2 factory 5line) 23.02~present
Upgrade of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Clean Booth(laboratory), FFU, FILTER 23.01~present
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(1 factory Press#1,2), FFU, FILTER 22.10~present
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(3 factory Rewinder), FFU, FILTER 22.07~22.10
Upgrade of clean booth for Samsung SDI Suwon Samsung SDI
Korea Clean Booth(P4, Local dehumidification), FFU, FILTER 22.07~22.08
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(3 factory Slitter), FFU, FILTER 22.06~22.10
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(2 factory #11), FFU, FILTER 22.06~present
Manufacturing and installation of clean booth for Samsung SDI Suwon Samsung SDI
Korea Clean Booth(P2, Local dehumidification), FFU, FILTER 22.05~22.10
Manufacturing and installation of clean booth for Samsung SDI Ceonan Samsung SDI
Korea Clean Booth(Local dehumidification), FFU, FILTER 22.05~22.08
Manufacturing and installation of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Clean Booth(u LED), FFU, FILTER 22.05~22.06
Manufacturing and installation of clean booth for Samsung SDI Malaysia Wonbang Tech
Malaysia Clean Booth(3 factory), FFU, FILTER 22.03~22.10
Manufacturing and installation of clean booth for Samsung SDI Hungary Jeil machine
Hungary Clean Booth(2 factory #9,10), FFU, FILTER 22.02~present
Remove and relocation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth Demolition and Reinstallation 21.12~22.01
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(Odor reduction), FFU, FILTER 21.12~present
Manufacturing and installation of clean booth for KDL Hungary KDL
Hungary Clean Booth(Impactcan examination#3,4), FFU, FILTER 21.11~present
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth(Loswer sealing) 21.09~22.02
Manufacturing and installation of clean booth for Samsung Electronics Pakistan Samsung Electronics
Pakistan Clean Booth, FFU, FILTER 21.07~21.09
Manufacturing and installation of clean booth for Samsung Electronics Vietnam Samsung Electronics
Vietnam Clean Booth, FFU, FILTER 21.05~22.01
Manufacturing and installation of clean booth for Samsung SDI Hungary Jeil machine
Hungary Clean Booth(Powder transfer system) 21.03~21.06
Manufacturing and installation of clean booth for Satrec Initiative Daejeon Satrec Initiative
Korea Clean Booth(Modular), FFU, FILTER 21.02~21.04
Manufacturing and installation of clean booth for KDL Hungary KDL
Hungary Clean Booth(Impactcan examination), FFU, FILTER 21.03~21.06
Upgrade of clean booth for Hyvision system Cheonan Hyvision
Korea Clean Booth Upgrade 20.12~20.12
Upgrade of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Clean Booth(VD Alpha LLO), FFU, FILTER 20.11~21.12
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(1 factory #1~3), FFU, FILTER 20.11~present
Upgrade of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth Upgrade(M1) 20.08~20.11
Manufacturing and installation of clean booth for Gosuryeon oriental medical Hasseu
Korea Clean Booth, FFU, FILTER 20.07~20.08
Manufacturing and installation of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Clean Booth VD Alpha LLO, FFU, FILTER 20.07~20.08
Upgrade of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth Upgrade(M2 Bldg) 20.07~20.12
Upgrade of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth Door Upgrade 20.07~20.10
Manufacturing and installation of clean booth for Samsung SDI Giheung Samsung SDI
Korea Clean Booth(E4 bldg.A Line), FFU, Filter 20.06~20.07
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary Clean Booth(Dust Control), FFU 20.04~20.07
Manufacturing and installation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth(M1 Bldg) 20.04~20.06
Manufacturing and installation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth, FFU, FILTER 20.01~20.02
Manufacturing and installation of clean booth for DGIST, Daegu DGIST
Korea Clean Booth, FFU, FILTER 19.12~20.01
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean Booth, FFU, FILTER 19.09~22.01
Manufacturing and installation of clean booth for Samsung SDI Hungary Samsung SDI
Hungary System Wall, FFU 19.09~20.01
Upgrade of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Poly Carbonate Panel & Door Upgrade 19.08~19.11
Manufacturing and installation of clean booth for Samsung SDI Tianjin Samsung SDI
China Clean booth(20,100sf), FFU, FILTER 19.05~19.08
Upgrade of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean Booth, 3 set Upgrade 19.04~19.08
Manufacturing and installation of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Clean booth(10,500sf), FFU, FILTER 19.01~19.11
Manufacturing and installation of clean booth for Samsung SDI Cheongju Samsung SDI
Korea Clean booth(1,600sf), FFU, FILTER 18.11~19.02
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean booth(2,900sf), FFU, FILTER 18.09~19.04
Manufacturing and installation of clean booth for KCENC Gas Production Division KCENC
Korea Clean booth(1,200sf), FFU, FILTER 18.05~18.07
Manufacturing and installation of clean booth for Samsung SDI Malaysia Samsung SDI
Malaysia Clean booth(14,300sf), FFU, FILTER 18.04~18.08
Remove and relocation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Remove & relocation of clean booths 18.03~18.03
Manufacturing and installation of clean booth for Asan ENG Technopark, Ochang Asan ENG
Korea Clean Booth, Cleang Bench, FFU 18.02~18.02
Manufacturing and installation of clean booth for semiconductors at Inha University Narae ENC
Korea Clean Booth(2,000sf), BLDC, FFU 18.01~18.04
Remove and relocation of clean booth for Samsung Electronics Suwon Samsung Electronics
Korea Remove & relocation of clean booths 18.01~18.02
Remove and relocation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Remove & relocation of clean booths 17.12~18.01
Remove and relocation of clean booth for SEVT Samsung Electronics
Vietnam Remove & relocation of clean booths 17.11~17.12
Manufacturing and installation of clean booth for SEV (3D thermal forming) Samsung Electronics
Vietnam Clean booth(730sf), FFU, FILTER 17.10~17.12
Modification of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Modification of 4 clean booths 17.10~17.11
Manufacturing and installation of clean booth for Samsung Electronics, Gumi Samsung Electronics
Korea 2 Clean booths, FFU, FILTER 17.05~17.06
Modification and relocation of clean booth for SEVT Samsung Electronics
Vietnam Modification & relocation of 50 clean booths 17.03~17.07
Manufacturing and installation of clean booth for SEHC Samsung Electronics
Vietnam Clean booth(2,200sf), FFU, FILTER 17.01~17.07
Manufacturing and installation of clean booth for Bangladesh branch Samsung Electronics
Bangladesh Clean booth(1,100sf), FFU, FILTER 16.12~17.06
Manufacturing and installation of clean booth for Samsung SDI Cheonan Samsung SDI
Korea Clean booth(7,300sf), FFU, FILTER 16.11~17.09
Manufacturing and installation of clean booth for Haesung Optics Haesung Optics
Vietnam 61 Clean booths, FFU, FILTER 16.11~17.01
Manufacturing and installation of clean booth for SEVT (LAMI) Samsung Electronics
Vietnam Clean booth(3,600sf), FFU, FILTER 16.05~16.08
Manufacturing and installation of clean booth for Haesung Vina Haesung Vina
Vietnam 41 Clean booths, 63 clean tables, FFU, FILTER 16.04~16.05
Manufacturing and installation of clean booth for Hungary Samsung Electronics
Hungary Clean booth(4,400sf), FFU, FILTER 16.04~16.08
Manufacturing and installation of clean booth for SEV (LAMI G) Samsung Electronics
Vietnam Clean booth(2,500sf), FFU, FILTER 16.03~16.05
Manufacturing and installation of clean booth for SEV (internalization) Samsung Electronics
Vietnam Clean booth(1,800sf), FFU, FILTER 16.01~16.03
Manufacturing and installation of clean booth for SEVT (GLASS G) Samsung Electronics
Vietnam Clean booth(2,500sf), FFU, FILTER 15.12~16.02
Manufacturing and installation of clean booth for Egypt branch Samsung Electronics
Egypt Clean booth(2,900sf), FFU, FILTER 15.11~16.01
Manufacturing and installation of clean booth for SEV (UV molding) Samsung Electronics
Vietnam Clean booth(2,900sf), FFU, FILTER 15.10~15.12
Manufacturing and installation of clean booth for SEHC Samsung Electronics
Vietnam Clean booth(6,600sf), FFU, FILTER, TAB 15.08~16.04
Manufacturing and installation of clean booth for SEV (internalization line) Samsung Electronics
Vietnam Clean booth(2,200sf), FFU, FILTER 15.06~15.07
Manufacturing and installation of clean booth for SEV (T5 homekey) Samsung Electronics
Vietnam Clean booth(4,400sf), FFU, FILTER 15.06~15.07
Manufacturing and installation of clean booth for Dongwoo Fine-Chem, Pyeongtaek Dongwoo Fine-chem
Korea Clean booth(2,200sf), FFU, FILTER 15.03~15.04
Manufacturing and installation of clean booth for SEVT (unloader) Samsung Electronics
Vietnam Clean booth(2,900sf), FFU, FILTER 15.03~15.04
Environment improvement of clean booth for SEV (printing line) Samsung Electronics
Vietnam Clean booth(1,800sf) 15.03~15.04
Manufacturing and installation of clean booth for SEV (3D thermal forming) Samsung Electronics
Vietnam Clean booth(3,300sf), FFU, FILTER 15.01~15.02
Manufacturing and installation of clean booth for SEV (LAMI) Samsung Electronics
Vietnam Clean booth(3,600sf), FFU, FILTER, TAB 15.02~15.03
Manufacturing and installation of clean booth for SEV (3D thermal forming) Samsung Electronics
Vietnam Clean booth(3,600sf), FFU, FILTER 15.01~15.02